Project Description/Scope of Work

Pier Support structure require as part of the NZTA enabling work to allow for the extension of the Northbound Greenlane off ramp.

The scope includes building of new pier structure and removal of the two existing column.

Geographic extent

The Ellerslie Pier Support is located on Main Highway over SH1.

Project challenges to date:

• Working at height next to live 25KV Rail overhead cable

• Timing of work including material delivery while Rail is still on service and traffic on State Highway 1.

• Load transferring from the old column into the new pier structure while SH1 traffic and Main Highway Traffic is still live.

Positive change make to Project:

• Site supervisor and Engineer working alongside JV-Rail Project Manager putting construction methodology to minimise disruptions to SH1 users and Rail commuter.

• Working directly with client program milestones/budget.

 

Location: Auckland

Client: Fulton Hogan John Holland Joint Venture (JV-Rail)

Site Management: Kelvin Louie

Contract Type: Construct Only

Start/Finish Date

Start: November 2013

Finish: August 2014

Auckland Transport Platform Upgrade

Read More

Makatote Viaduct Bridge

Read More

The Waikato Expressway

Read More

North West Urban Maintenance

Read More

PATHWAYS Joint Venture

Read More

Auckland Electrification Project

Read More

Large Plant, Equipment & Mechanical Support Supply

Read More

Ellerslie Highway Main Highway connection Stage 2 Pier Support Structure

Read More